Pleasant Valley Road Widening:
Widening and reconstruction of 2 miles of Pleasant Valley
Road in Parma, Ohio.
U.S. Route 30 Freeway:
Design of 8 miles of new divided freeway for U.S. Route
30 in Wayne County, Ohio. The project includes 2 interchanges and
14 bridges.
State Route 254 Bridge:
In-depth bridge inspection of the S.R. 254 bridge over
the Lorain County Metropark and Black River for the Ohio Department of
Transportation.
Snow Road Grade Separation:
Design of a grade separation for CSX Railroad over
Snow Road in Brook Park, Ohio.
Maypine Farm Estates:
Site improvement plans for a 65 acre residential subdivision
in Highland Heights, Ohio.
Lakeshore Boulevard Bridge:
Approach roadway design and bridge replacement for the
Lakeshore Blvd. (S.R. 283) bridge over the Chagrin River in Eastlake, Ohio. |