Other Highway and Transportation Projects Include:                                                                                      Home       Back
CUY/LAK-90-29.92/0.00 (Euclid Spur):
Preliminary engineering study and final improvement plans for the addition of auxiliary lanes on I-90 from 2,700 feet west of Euclid Avenue to 2,100 feet east of Euclid Avenue, including the widening and relocation of entrance and exit ramps.
Project cost $12 million.
S.R. 175 (Richmond Road Widening):
1.4 mile relocation and widening of Richmond Road in Lyndhurst, Ohio.
Project cost $6.5 million.
CUY-IR-71.00 Widening:
Widening, upgrading, repair and resurfacing of 5.72 miles of I-71, including ramps in the Cities of Brunswick, Strongsville, and Middleburg Heights, Ohio.
Project cost $25 million.
Ohio Turnpike (IR-80):
Design and plans for construction of 9.2 miles of two inside median lanes, shoulders, and concrete barriers as part of the Ohio Turnpike Commission's overall Third Lane Construction Program.
Project cost $32 million.
Center Street Roadway Reconstruction and Bridge Replacement Over the Mahoning River:
Project consisted of rehabilitation/replacement of the Center Street Bridge over the Mahoning River.  Roadway plans were prepared for the reconstruction of over one mile of this four lane arterial.
Project cost $16 million.
CUY-271X-10.21:
Design and plans for construction of 4.6 miles of two interior express lanes or "dual-dual" lanes within the existing median of Interstate 271 in the Cities of Beachwood, Highland Heights, Lyndhurst, Mayfield Heights, Pepper Pike and the Village of Mayfield.
Project cost $14 million.