Snow Road Lowering

Services

  • Roadway
  • Structures
  • Surveying

Client

  • City of Brook Park, Ohio

Location

  • Snow Road under CSX Railroad

Tasks Performed

  • Roadway Design
  • Drainage Design
  • Bridge Design
  • Utility Coordination
  • Maintenance of Traffic
  • Right-of-Way Plan Development

Project Description

Euthenics provided engineering and surveying services for final plans and specifications for roadway, maintenance of traffic, drainage and right-of-way plans for the Snow Road grade crossing elimination with the CSX Railroad. The plans included the design of welded steel girder bridge for the CSX Railroad over Snow Road, the reconstruction of approximately 1,600 feet of Snow Road, and a stormwater pump station to drain the underpass that frequently flooded the road. A temporary railroad runaround and a two-lane runaround for Snow Road were constructed to maintain rail and vehicular traffic during construction. Plan review and approvals were coordinated with the railroad. Easements were obtained from the railroad to permit construction of the new bridge and the project included temporary and permanent easements and acquisitions for 29 parcels.